Functional flow diagrams, 1-11
G
Graph, beam position/pattern, 4-8 to 4-9
Gravity expansion tank, 2-9
Gun/battery alignment, 3-1 to 3-17
H
Heat exchangers, 2-6 to 2-8
I
Inclination verification, 3-14
Index, relay & relay/lamp, 1-19 to 1-20
Integrated maintenance, 1-5 to 1-6
Interequipment leveling, 3-14
L
Lamp pyramid diagram, incorrect, 1-22
Leveling, interequipment, 3-14
Levels, alignment, 3-7
Linear displacement, 3-3
Liquid-cooling systems, 2-1 to 2-27
alarm switchboards, 2-24 to 2-26
basic, 2-1 to 2-4
components/configurations, 2-4 to 2-26
maintenance responsibility, 2-26
types I, II & III, 2-2 to 2-6
Log, combat/weapons systems smooth, 3-16
Logic diagrams, 1-11
Low-flow switch, cooling system, 2-17
M
Machining, foundation, 3-14
Maintenance
data system, 1-4 to 1-5
index page, 1-4
integrated, 1-5 to 1-6
responsibility, liquid-cooling system, 2-26
scheduling, 1-2 to 1-4
support documentation, 1-10 to 1-23
turn-on procedures, 1-17
Master reference plane, 3-13
Matrix
fault analysis, 1-14 to 1-15
test mode, 1-9 to 1-10
Meter, purity, 2-22
Mixed-bed cartridge, 2-22
O
Offset centerline marks, 3-13
Optical alignment, 3-14
Optics, self-contained, 3-8
Organic removal cartridge, 2-21
Orifice flowmeter, 2-18
Oxygen analyzers, 2-23
P
Parallax corrections, 3-3 to 3-5
Parallel lines/planes, 3-2
Parallelism, 3-14 to 3-15
Plane, reference, 3-13
Planned Maintenance System, 1-1 to 1-6
Pressure
expansion tank, 2-9
regulator, 2-16
Primary liquid-cooling system, 2-1 to 2-4
Problem directory, 1-23
Procedures
combat systems alignment, 3-12
maintenance turn-on, 1-17
radar collimation, 4-6 to 4-9
video processing & distribution system checkout,
1-22
Pumps, circulating, 2-19 to 2-20
Purity meter, 2-22
Pyramid diagram, 1-19
Q
Quarterly schedule, 1-4
R
Radar collimation
procedures, 4-6 to 4-9
shore towers, 4-4 to 4-5
theory, 4-1 to 4-6
with a shore-based tower setup, 4-2
Readings, benchmark/tram, 3-15
Reference
frame, 3-2 to 3-5
marks, placement of, 3-13 to 3-14
plane, 3-3, 3-13
readings, benchmark/tram, 3-15
Regulators
constant-flow, 2-15
equipment-flow, 2-16
INDEX-2