Regulators (continued)
flow, 2-15 to 2-16
pressure, 2-16
Relay
index, 1-20
lamp ladder diagram, 1-20 to 1-21
Rotameter, 2-18 to 2-19
Rotational corrections between unparallel planes, 3-5
S
Schedule, cycle/quarterly/weekly, 1-4
Seawater strainers, 2-10 to 2-12
Secondary liquid-cooling system, 2-4
Self-contained optics, 3-8
Ship
base plane, 3-13
weighting for reducing motion, 4-6
Shore towers, collimation, 4-4 to 4-5
Sights, alignment, 3-7 to 3-9
Signal-flow diagram, 1-17 to 1-18
Simplex strainer, 2-11
Star checks, 3-15
Static parallax corrections, 3-4 to 3-5
Strainers, seawater, 2-10 to 2-12
Subsystems testing, 1-5 to 1-6
Switchboards, liquid-cooling system alarm, 2-24 to 2-26
Switches, 2-17 to 2-18
System
fault indicator directory, 1-11 to 1-23
function directory, 1-11 to 1-13
functional diagram, 1-4
maintenance program test programs, 1-9
T
Tanks, expansion, gravity/pressure, 2-9 to 2-10
Tartar radar
C-band and X-band feed horns, 4-3
Tartar radar (continued)
collimation axes, requirements, 4-2 to 4-4
CWI beam relationships, 4-3
Telescopes, boresight, 3-8
Temperature-regulating valves, 2-12 to 2-14
Test
equipment, collimation, 4-5 to 4-6
mode matrix, 1-9
number select codes, 1-9
Testing, equipment/subsystems, 1-5 to 1-6
Theodolites, 3-6
Theory, radar collimation, 4-1 to 4-6
Three-way temperature-regulating valves, 2-12 to 2-13
Tower array, 4-5
Track-receive/-tranmit collimation, 4-7 to 4-8
Training alignment, 3-14 to 3-15
Tram
bars/blocks, 3-9 to 3-11
reference readings, 3-15
Transits, 3-6
Troubleshooting, 1-16 to 1-23
Two-way temperature-regulating valves, 2-13 to 2-14
Types I, II & III liquid-cooling systems, 2-2 to 2-6
V
Valves, temperature-regulating, 2-12 to 2-14
Venturi flowmeter, 2-18
Verification, inclination, 3-14
Video processing & distribution system checkout
procedures, 1-22
W
Weapons
control reference plane, 3-13
system functional diagram, 1-14
Weekly schedule, 1-4
INDEX-3